Urbanboatworks Marine Projects Resume

Q Class Wooden Boat

Work On Wooden Boats

  • S/V Extra Dry floor timbers- ribs- butt blocks- planking
  • 1924 23 foot knock about Timberpoint Steam bent ribs, floor timbers, center board trunk, deck, shear stake, garboard, spars,
  • built 5 clam boat garveys from scratch
  •  K and T Products – machine shop apprentice
  • Built H-28 Ketch S/V Ishtar from line drawings
  • Worked for Babylon Marine doing various repair projects on wooden production motor boats-
  • 41 foot Gardner Ketch S/V Malabar – new transom, cockpit, side decks
  • On going saga of derelict cold molded wooden sloop “ Tiger Maru” – made sea worthy by 1986-sailing from West Indies to New York half a dozen times -Most recent refit 2009- replace cockpit with new single Molded fiberglass and bridge deck, new mid ship floor Timbers, reconfigured galley to new bridge deck, Mast step, replaced lower stem, replaced 30 sq feet of Cold molded planking,
  • Replication of 1951 30 ft Egg Harbor in the Virgin Islands Saved keel and stem,
  • 1935 35 foot Rhodes sloop “Winddrift” replace 4 ribs, re place mast step and floors replaced shear strake, replaced covering board, repaired deck beam ends, replaced 7 ribs in main salon up to the sisters at turn, replaced floor timbers, new garboard and three strakes above
  • 1930ʼs Alden Yawl- S/V Gratia Virgin Islands Rebuild broken mast
  • Dock Building project – Reicon NYC Replaced wooden whalers, bumpers, sheathing and deck on the under side of the marine transfer station in Collage Pt Queens NY
  • 40 ft Passenger Perdohm Catamaran water taxi Replaced port wave piercing bow to coast guard specs
  • 70 foot Ketch S/V No Nonsense Replaced teak taft rail and cap rail , rebuild combing, repaired rot in lazarette boxes
  • 1937 Rhodes 41 foot yawl S/V Golden Eye Scarfed mizzen mast together and fixed broken cap rail
  • 1946 Alden Yawl S/V Aegir Rebuilt main boom,  various Dutchmen’s to bright surfaces, Yearly brightwork & Hull painting 1946 Wintrop Warner Sloop S/V Mary Loring, Replaced 7 set of frames and floor timbers in bow Replace section of stem in bow, Scarfed in three new plank ends, splined 30 ft seams, Replaced 3 frames aft, replaced planking, caulk
  • 1929 John Alden Q Boat S/V Hope New York Repaired forward broken bulwarks and caprail, Set new bow chocks, spring maintenance repair Rot in bulwark, covering board and shear strake, replace 2 sections of cockpit combing, various dutchmens, Haul out- scarfed in new bottom of rudder, replaced Worm shoe, fabricated new bottom gudgeon, painted hull
  • Rhodes 41 Ft S/V Golden Eye Built bowsprit, repair to main mast broken at upper Spreaders.
  • 1950 Huckins Motor Boat S/V Dolphin Replaced cabin trunk corner post, replaced cabin side, Fabricated and installed new eyebrow

 

Rot Work
Rot Work
Tiger Maru a cold molded one ton- rebuilt
Tiger Maru a cold molded one ton- rebuilt

 

New Cockpit being installed in Wooden boat Tiger Maru
New Cockpit being installed in Wooden boat Tiger Maru

 

Rot Repair to Cold Molded Wooden Boat
Rot Repair to Cold Molded Wooden Boat
Replanking Cold Molded Wooden Boat
Replanking Cold Molded Wooden Boat


DSC_0186

DSC_0042 DSC_0072 DSC_0095

DSCF2775
DSCF2973 DSCF4796

wooden boat Hukins rot repair- new york
wooden boat Hukins rot repair- new york

Published by Dana Carini

Sailing thru water. restoring and refinishing wooden boats and homes. Handcrafting a collection of last a lifetime- inheritable objects. ( worldsendny) Inspiration comes from the places we sail, the people we meet and the history of long ago.

Leave a comment